Our work at Shelter Hall in Brighton was part of 'Phase 1' of the project where we installed the 'Raw Pop-Up' area. It is hoped that the full food court […]
Our work at Shelter Hall in Brighton was part of 'Phase 1' of the project where we installed the 'Raw Pop-Up' area. It is hoped that the full food court […]
This project took place in Hyde Park, London on behalf of café and restaurant chain Benugo. A large amount of work took place to complete this project successfully including a […]
The Benugo café at 40 Grosvenor Place was surveyed and high quality drawings were completed as part of the design process. The installation took place in two separate stages. The […]
The work took place in the Science Museum’s 4th/5th floor event space, specifically the large function space on the 5th floor serving the ‘Illuminate’ event area for up to 400 […]
Our recent project at Aldbourne Nursing Home was split into 3 phases to accommodate the major construction work and equipment installation taking place. Phase 1 The area was stripped out […]