Our recent project at Aldbourne Nursing Home was split into 3 phases to accommodate the major construction work and equipment installation taking place.
The area was stripped out in preparation for the major extension works taking place in the summer.
We supplied a fully-welded stainless steel wall-pattern extraction canopy, wall cladding and supply air system.
The final phase saw the major extension works taking place with the kitchen doubling size and a new dining room being constructed. Once this was done, the new kitchen equipment was installed.
Equipment installed;
"This is a dummy quote from a fictional person to show how a testimony might look. Fulrcum rock, I would use them again without hestitation. The project has been a huge success and I am very happy with the end result."
We are committed to supplying the very best catering equipment from the industry’s most trusted manufacturers. To find out more call 01672 515990 or email info@fulcrumkitchens.co.uk.